# How do I set a package validity period in Rekaz?

Source: https://help.rekaz.io/en/articles/16425174-how-do-i-set-a-package-validity-period-in-rekaz
Updated: 2026-08-19

The older Period action is not shown in the current Rekaz interface, and no value, unit, or save action for package validity is shown.

  

Use the steps below to reach the available package screen. Do not assume that a package start date or a Period value can be configured from the controls shown here.

  

# Steps

1.  On the Packages page, select Create Package.
    
    _The Create Package screen opens._
    
2.  On the package creation screen, select Package Information.
    
    _The Package Information section is displayed._
    
3.  The Create Package heading is visible, but no control labelled Period or validity-period value and unit are available.
    

  

# Illustrated guide

**Step 1:** Select Create Package on the Packages page.

  

[![Select Create Package on the Packages page. in Rekaz](https://rekaz-794204f202e4.intercom-attachments-1.com/i/o/aahcqj2g/2618830171/7205876a95b938ec6dd7b219869b/rys5la.png?expires=1787961600&signature=842d4253d54e495a670c56fc3cdc6dd4bf2374644ce8b9b4968187af9f62b98f&req=diYmHsF9nYBYWPMW3nq%2BgS%2BhWdKRBUBlD8FIsSN9%2B%2BHCdE03fAPsqVYWQg3E%0AvMoIiTWXJVphCnvhgDwTNRI2dJg%3D%0A)](https://files.catbox.moe/rys5la.png)

  

**Step 2:** Open Package Information in the Create Package workflow.

  

[![Open Package Information in the Create Package workflow. in Rekaz](https://rekaz-794204f202e4.intercom-attachments-1.com/i/o/aahcqj2g/2618830202/33c7cde4b8590866de2927334f30/jqnt1c.png?expires=1787961600&signature=b2e353ec901652448a68a539c26531befb3e711067634f8d24a1c01b2984d1fe&req=diYmHsF9nYNfW%2FMW3nq%2BgTUCSMiJnrPjqMtyeWWqxzAUSja7JWAbClMsNEst%0Aa8sVs52Kc%2FMR2YzvkhkBKevt3kE%3D%0A)](https://files.catbox.moe/jqnt1c.png)

  

**Step 3:** The current Create Package screen does not provide an available Period setting.

  

[![The current Create Package screen does not provide an available Period setting. in Rekaz](https://rekaz-794204f202e4.intercom-attachments-1.com/i/o/aahcqj2g/2618830255/dd602b9c1a9ad480c3766a6216f1/rys5la.png?expires=1787961600&signature=a2bba2c55803b216e1aba39c673605296cd86d54d21d32e15f292f3d63464b22&req=diYmHsF9nYNaXPMW3nq%2BgV6Ce%2BKf27whoLOB4Y9eNnNR74HoR4fx6Ji7VNhT%0AK3wopKlMBiv5aFAeeSMTl4rVymU%3D%0A)](https://files.catbox.moe/rys5la.png)

  

# Important notes

  

The package start date affects the package’s actual end date.

  

-   Before saving, check both the period value and its unit.
    
-   Use a package start method that matches how you want the package validity to begin.
    

  

# Related questions

-   How do I make a package valid for one month in Rekaz?
    
-   Where can I change a package period in Rekaz?
    
-   How do I set a package end date in Rekaz?
